JMD Megapolis IT Park, Sohna Road, Sector 48, Gurgaon, Haryana 122018 India
I booked both SF 231 with 978 Sq ft and this O-440 with 1361 sq ft on July 19, 2008 with JMD Megapolis IT Park Sohna Road Gurgaon. The giant Megapolis IT Park is shy of One Million Sq Ft area and one of the biggest IT Structure in the NCR.
Other major features are given below:
SPECIFICATIONs
BUILDING DATA
Site Area : 10,025 Acres
Total Permissible Area : 9,57,091.452 sq.ft.
No. of Storys : 13
STUCTURE 3 LAVEL
Foundation : Compete R.C.C foundation
Super Structure : R.C.C controlled concrete framed structure
ARCHITECTURE
- Colorful polished granite/marble flooring.
- Polished granite/marble permanent cladding on external surfaces of Units.
- Decorative aluminium curtain wall with imported bronze grey tinted reflective toughened glass in floors.
- Aluminium windows/glazing with clear toughened glass for Units.
- Stainless steel handrail with transparent polycarbonate sheet stair railing atrium.
- Perforated aluminium lineal false ceiling in public areas.
- Mural, water bodies, landscape in atrium.
AIR - CONDITIONING
- Centrally air-conditioned Units/other area with year round environmental control.
- 100% electrical back up for HVAC systems.
- Basements mechanically ventilated.
ELECTRICAL
- 100% back-up with copper wiring distribution.
FIRE PROTECTION
- Sophisticated fire protection system comprising hydrants, sprinklers, automatic fire detection and alarm system.
ELEVATORS
- Passengers and service elevators as per Architectural requirement.
|
|
|
|
|
|
The possession, of the Unit # JMD 440 of 1361 Sq ft of Super Built-Up Area which included 860 Sq ft of Carpet Area, was taken over by the Preet Kapoor Estates Pvt Ltd on Aug 29, 2016. Our CA Mr Amar Rai co-ordinated with various agencies for making arrangements for regulating the balance payment and up-to-date maintenance charges.
Mr Satyam Vig of M/S A2Z Interiors was picked up among many venders to furnish the Unit. Mr Vig helped to coordinate with JMD for making it all happen.
Mr Satyam Vig also brokered a client M/S PROFORMICS DIGITECH PVT LTD at Rs 50/- per Sq Ft for an initial lock-in period of THREE years. The Unit has to be fully furnished as per the clients requirement and lease term of the Unit will be effective from Oct 3, 2016.
Here are the pictures from time to time of the progress of Furnishing of the Unit 440:
Sep 8, 2016
Sep 11, 2016
Sep 19, 2016
Sep 21, 2016
Sep23, 2016
Sep 26, 2016
Oct 10, 2016
Oct 12, 2012
Well Done A2Z Interiors. Thanks.
The Project has successfully been completed with Waheguru's blessings
Congrats to the Kapoor Family for the completion of this Project successfully. From now on, Maintainace Electricity charges will be born by M/S Proformics Digitech Pvt Ltd w.e.f. 12th Oct, 2016 with a Lock in period of 3years.
Final Touches and Tinting the Glass on OCT 20, 2016